Maintenance (Continued)
GEARS
The gears (656-12A and 656-12B)
do not have to be timed and as a result,
they do not have to be oriented
i
n a certain position during assembly.
H
owever, for proper operation of the
1/2, 1, 3, 5 and 10 ton units, one gear
marked “A” and one gear marked “B”
must be used.
PREVENTIVE MAINTENANCE
In addition to the inspection procedures,
a preventative maintenance program
should be established to prolong the
useful life of the hoist and maintain
its dependability and continued safe use.
The program should include the periodic
inspections with particular attention
being paid to the lubrication of various
components using the recommended
lubricants (See Figure 8).
TESTING
Prior to initial use, all repaired or used
hoists that have not been operated for
the previous 12 months shall be tested
by the user for proper operation.
Test the unit first in the unloaded state
and then with a light load of 100 lbs.
times the number of load supporting
p
arts of load chains to be sure it oper-
ates properly and the brake holds the
load when the hand chain is released;
then test with a load of 125% of its
rated capacity.
In addition, hoists in which load
sustaining parts have been replaced
must be tested with 125% of rated
capacity by or under the direction
of a designated person and a written
report prepared for record purposes.
NOTE: Because this hoist is equipped
with a load limiting device occasional
slipping of the handchain wheel may
occur when testing with 125 percent
of rated load.
NOTE: For additional information
on Inspection and Testing refer to
ASME B30.16,”Overhead Hoists”,
obtainable from ASME Order
Department,
22 Law Drive, Box 2300, Fairfield, NJ
07007-2300, U.S.A.
INSPECTOR’S REPORT
ITEM REMARKS (LIST DEFICIENCIES AND RECOMMENDED ACTION)
Inspector’s Date
Signature Inspected Approved by Date
Figure 7 - Recommended Inspector’s Report
RECOMMENDED LUBRICATION SCHEDULE*
CM
®
HURRICANE 360 HAND HOIST
KEY NO. COMPONENT TYPE OF LUBRICANT ** ORDER TYPE OF SERVICE AND
(SEE PAGES PART NO. FREQUENCY OF LUBRICATION
(12 & 13) HEAVY NORMAL INFREQUENT
656-28 Load Chain Lubriplate
®
Bar and 28619 Daily Weekly Monthly
Chain Oil 10-R (1 gal. can)
656-11 Gears and
656-12 Bearing Surfaces 28629 When hoist is disassembled for cleaning
656-13 of Upper Poliplex 2 (1 lb. can) or repairs
656-17 and Lower
Hook Knobs
* This lubrication schedule is based on a hoist operating in normal environment conditions. Hoists operating in adverse
atmospheres containing excessive heat, corrosive fumes or vapors, abrasive dust, etc., should be lubricated more frequently.
** See page 12 for ORDERING INSTRUCTIONS.
Figure 8 - Recommended Lubrication Schedule